The back or North side of the house showing the pressure treated nailing strips where the
cypress boards will be attached.  The house is situated so that the sides each face one of the
4 compass directions.  The first section is to the right.
North side with the battens in place and before the scaffold was removed,
South side, (front) of the house showing mixed board and batten and lap siding.
The cypress boards applied.  I mixed the siding between board and batten and lap siding.  If I
were to do it all over again, I would use only board and batten siding because it is so much
easier to apply and simpler to repair if needed.
Home